When you receive your Quick Quote estimate from BAI, the costs for BAI Materials and the estimated costs for the GC are included in the Turnkey Home Price. Items listed under "Materials Package" are the materials included in your BAI shell package price, assuming standard material selections. Please note there are a wide variety of options and upgrades available. If you do select various options and upgrades, some of the materials and pricing will change.
While Erected Shell Labor and Balance of Construction (Turnkey) costs are included in your BAI estimated price, they are the responsibility of the General Contractor and/or the Homeowner to complete. NOTE: These are the typical items provided by your local contractor, not BAI, on your developed lot. The exact labor and materials used in your area, and prices for these, may differ based on local availability, local code requirements or your preferences.
ITEMS NOT INCLUDED
Site development costs are not included in the Erected Shell Construction or Turnkey Home figures. These costs can be estimated and added to the cost of construction at the option of the homebuyer and local contractor for a fee. Fees for grading, trenching and installation of utilities, local developer fees, etc., will vary according to local code, location and attributes of individual parcels, etc. Therefore, cost of site development cannot be estimated accurately nor prices quoted without research. Utilities items not included: Trenching and connections for gas, water, electric, sewer, well and/or septic systems; tap fees.